Project Calendar
Project events, milestones, appointments, delivery and installation timing.
/admin/projects/:slugFuture Spec 12 →Current-state summary
No Calendar tab, embedded agenda, schedule view or Project timeline was found in the reviewed Project profile. Project Builder provides default Phase durations and task due-date anchors, including Project Start, Phase Start, Phase Target and Installation Date, but the Project exposes no working calendar where those dates can be reviewed or coordinated.
Interface inventory
Anatomy and verified behavior
Verification states separate observed behavior from requirements or assumptions.
| Element | Current behavior | Verification |
|---|---|---|
| Project Calendar entry | Absent from Project tabs and Overview. | Verified absent |
| Schedule inputs | Project Builder has durations, due anchors and offsets; Create/Edit Project has Completion Target. | Verified live |
| Calendar views | No agenda, month, week, timeline or resource view was found. | Verified absent |
| External calendar sync | Not represented in the current Project surface. | Absent |
User journeys
Current flows
Coordinate Project schedule
- Open Project Calendar
- Review Phase targets and milestones
- Schedule Client and Provider work
- Resolve conflicts and dependencies
- Publish permitted events
- Synchronize eligible events to connected calendars
State model
Current and expected states
No Project Calendar navigation is present.
Rosedale displays Not set.
Basic due anchors and offsets exist in Project Builder.
Product rules
Non-negotiable boundaries
- Project Calendar is a projection of canonical events, tasks and milestones—not a separate copy.
- Project Phase, Work Order, receiving, delivery and installation dates remain distinguishable.
- Provider and Client visibility is explicit per event.
- Google Calendar synchronization never becomes the source of truth for Project scope or completion.
Known current limitations · 3 mapped
What is missing, broken or unverified
Future Spec 12 owns closure →- No current Calendar UI exists in the Project.
- No conflict, availability, recurrence, timezone, resource or external-sync behavior is visible.
- Installation Date is offered as a template anchor without an observed canonical Project field.
Future alignment
Required evolution
- 01Add Project Calendar and agenda surfaces from Spec 12.
- 02Make Phase targets, milestones and Provider appointments visible in context.
- 03Support resource and installation-day coordination.
- 04Add permission-scoped external synchronization with clear source and sync health.
Current baseline
Acceptance record
- The missing current module is explicit.
- Existing date anchors are documented without implying a Calendar implementation.
- Future behavior is owned by Spec 12.
Reverse-spec completeness
Documentation coverage
The interface is still changing, so visual evidence and repository tracing remain intentionally incomplete.
Purpose and user outcome
DocumentedRoles and access
DocumentedRoutes and entry points
DocumentedPage and component anatomy
DocumentedFields and displayed data
DocumentedPrimary actions
DocumentedForms and validation
DocumentedStates and transitions
DocumentedEmpty, loading and error states
DocumentedResponsive behavior
PartialAccessibility behavior
PartialActivity and audit events
PartialData sources and persistence
DocumentedNotifications and automation
PartialKnown defects and limitations
DocumentedReusable component dependencies
DocumentedFuture-spec conflicts
PartialVisual and repository evidence
DeferredAcceptance of current baseline
Documented